PAST CONSTRUCTION UPDATES


Friday, Nov. 11, 2022

During the coming week, crews will work in the following areas:

  • Intersection of County Road C and Hamline Avenue.
    • Restoration.
    • Lane shifts.
  • Southeast corner of Hamline Avenue and Rose Place.
    • Regulator station work.
    • No traffic impacts.
  • Hamline Avenue, between County Road B and Sandhurst Drive.
    • Restoration.
    • Lane shifts.

Local businesses and residences will remain accessible. Please follow posted detours. Schedules are subject to change.


Friday, Nov. 4, 2022

During the coming week, crews will work in the following areas:

  • Intersection of County Road C and Hamline Avenue.
    • Restoration.
    • Lane shifts.
  • Southeast corner of Hamline Avenue and Rose Place.
    • Regulator station work.
    • No traffic impacts.
  • Hamline Avenue, between County Road B and Sandhurst Drive.
    • Restoration.
    • Lane shifts.

Local businesses and residences will remain accessible. Please follow posted detours. Schedules are subject to change.


Friday, Oct. 28, 2022

During the coming week, crews will work in the following areas:

  • Intersection of County Road C and Hamline Avenue.
    • Restoration.
    • Lane shifts.
  • Southeast corner of Hamline Avenue and Rose Place.
    • Regulator station work.
    • No traffic impacts.
  • Intersection of Hamline Avenue and County Road B.
    • Restoration.
    • Lane shifts.
  • Intersection of County Road B and Lexington Avenue.
    • Restoration.
    • Lane shifts.

Local businesses and residences will remain accessible. Please follow posted detours. Schedules are subject to change.


Friday, Oct. 21, 2022

During the coming week, crews will work in the following areas:

  • Intersection of County Road C and Hamline Avenue.
    • Restoration.
    • Lane shifts.
    • No access to southbound Hamline Avenue.
  • Hamline avenue, between County Road C and Rose Place.
    • Restoration.
    • One-way, northbound only traffic.
  • Southeast corner of Hamline Avenue and Rose Place.
    • Regulator station work.
    • Natural gas testing activities.
    • No traffic impacts.
  • Hamline Avenue, between Commerce Street and County Road B.
    • Restoration.
    • Lane shifts, two-way traffic maintained.
  • Intersection of Hamline Avenue and County Road B.
    • Restoration.
    • Lane shifts.
    • No access to eastbound County Road B.
  • Hamline Avenue, between County Road B and Burke Avenue.
    • Restoration.
    • Lane shifts, two-way traffic maintained.
  • County Road B, between Hamline and Lexington avenues.
    • Restoration.
    • No traffic impacts.

Local businesses and residences will remain accessible. Please follow posted detours. Schedules are subject to change.


Friday, Oct. 14, 2022

During the coming week, crews will work in the following areas:

  • Intersection of County Road C and Hamline Avenue.
    • Restoration.
    • Lane shifts.
    • No access to southbound Hamline Avenue.
  • Hamline Avenue, between County Road C and Rose Place.
    • Restoration.
    • One-way, northbound only traffic.
  • Southeast corner of Hamline Avenue and Rose Place.
    • Regulator station work.
    • Natural gas testing activities.
    • No traffic impacts.
  • Hamline Avenue, between Commerce Street and County Road B.
    • Restoration.
    • Lane shifts, two-way traffic maintained.
  • Intersection of Hamline Avenue and County Road B.
    • Restoration.
    • Lane shifts.
    • No access to eastbound County Road B.
  • Hamline Avenue, between County Road B and Burke Avenue.
    • Restoration.
    • Lane shifts, two-way traffic maintained.
  • County Road B, between Hamline and Lexington avenues.
    • Restoration.
    • One-way westbound only traffic.

Local businesses and residences will remain accessible. Please follow posted detours. Schedules are subject to change.


Friday, Oct. 7, 2022

Crews have completed the natural gas main line installation and are now working to complete line testing and tie-in work.

During the coming week, crews will work in the following areas:

  • Intersection of County Road C and Hamline Avenue.
    • Line installation, equipment staging and restoration.
    • No access to southbound Hamline Avenue.
  • Hamline Avenue, between County Road C and Rose Place.
    • Line installation, equipment staging and restoration.
    • One-way, northbound only traffic.
  • Southeast corner of Hamline Avenue and Rose Place.
    • Regulator station work.
    • Natural gas testing activities.
    • No traffic impacts.
  • Hamline Avenue, between Commerce Street and County Road B.
    • Line installation, material staging and restoration.
    • Lane shifts, two-way traffic maintained.
  • Intersection of Hamline Avenue and County Road B.
    • Restoration.
    • Lane shifts.
    • No access to eastbound County Road B.
  • Hamline Avenue, between County Road B and Burke Avenue.
    • Restoration.
    • Lane shifts, two-way traffic maintained.
  • County Road B, between Hamline and Lexington avenues.
    • Line installation, material staging and restoration.
    • One-way westbound only traffic.

Local businesses and residences will remain accessible. Please follow posted detours. Schedules are subject to change.

We are coordinating our project construction with the following projects:


Friday, Sept. 30, 2022

During the coming week, crews will work in the following areas:

  • Intersection of County Road C and Hamline Avenue.
    • Line installation and equipment staging.
    • No access to southbound Hamline Avenue.
  • Hamline Avenue, between County Road C and Rose Place.
    • Line installation and material staging.
    • One-way, northbound only traffic.
  • Southeast corner of Hamline Avenue and Rose Place.
    • Regulator station work.
    • No traffic impacts.
  • Hamline Avenue, between Commerce Street and County Road B.
    • Line installation, material staging and restoration.
    • Lane shifts, two-way traffic maintained.
  • Intersection of Hamline Avenue and County Road B.
    • Restoration activities.
    • Lane shifts.
    • No access to eastbound County Road B.
  • Hamline Avenue, between County Road B and Burke Avenue.
    • Line installation and material staging.
    • One-way, northbound only traffic.
  • County Road B, between Hamline and Lexington avenues.
    • Line installation, material staging and restoration.
    • One-way westbound only traffic.

Local businesses and residences will remain accessible. Please follow posted detours. Schedules are subject to change.

We are coordinating our project construction with the following projects:


Friday, Sept. 23, 2022

We have completed 95% of natural gas line installation activities. Crews will test the natural gas line and connect it to the existing system in the area in the coming weeks.

During the coming week, crews will work in the following areas:

  • Intersection of County Road C and Hamline Avenue.
    • Line installation and equipment staging.
    • No access to southbound Hamline Avenue.
  • Hamline Avenue, between County Road C and Rose Place.
    • Line installation and material staging.
    • One-way, northbound only traffic.
  • Southeast corner of Hamline Avenue and Rose Place.
    • Regulator station work.
    • No traffic impacts.
  • Hamline Avenue, between Commerce Street and County Road B.
    • Line installation, material staging and restoration.
    • Lane shifts, two-way traffic maintained.
  • Intersection of Hamline Avenue and County Road B.
    • Restoration activities.
    • Lane shifts.
    • No access to eastbound County Road B.
  • Hamline Avenue, between County Road B and Burke Avenue.
    • Line installation and material staging.
    • One-way, northbound only traffic.
  • County Road B, between Hamline and Lexington avenues.
    • Line installation, material staging and restoration.
    • One-way westbound only traffic.

Local businesses and residences will remain accessible. Please follow posted detours. Schedules are subject to change.

We are coordinating our project construction with the following projects:


Friday, Sept. 16, 2022

During the coming week, crews will work in the following areas:

  • Intersection of County Road C and Hamline Avenue.
    • Line installation and equipment staging.
    • No access to southbound Hamline Avenue.
  • Hamline Avenue, between County Road C and Rose Place.
    • Line installation and material staging.
    • One-way, northbound only traffic.
  • Southeast corner of Hamline Avenue and Rose Place.
    • Regulator station work.
    • No traffic impacts.
  • Hamline Avenue, between Commerce Street and County Road B.
    • Line installation, material staging and restoration.
    • Lane shifts, two-way traffic maintained.
  • Intersection of Hamline Avenue and County Road B.
    • Restoration activities.
    • Lane shifts.
    • No access to eastbound County Road B.
  • Hamline Avenue, between County Road B and Burke Avenue.
    • Line installation and material staging.
    • One-way, northbound only traffic.
  • County Road B, between Hamline and Lexington avenues.
    • Line installation, material staging and restoration.
    • One-way westbound only traffic.

Local businesses and residences will remain accessible. Please follow posted detours. Schedules are subject to change.

We are coordinating our project construction with the following projects:


Friday, Sept. 9, 2022

During the coming week, crews will work in the following areas:

  • Intersection of County Road C and Hamline Avenue.
    • Line installation and equipment staging.
    • No access to southbound Hamline Avenue.
  • Hamline Avenue, between County Road C and Rose Place.
    • Line installation and material staging.
    • One-way, northbound only traffic.
  • Southeast corner of Hamline Avenue and Rose Place.
    • Regulator station work.
    • No traffic impacts.
  • Hamline Avenue, between Commerce Street and County Road B.
    • Line installation, material staging and restoration.
    • Lane shifts, two-way traffic maintained.
  • County Road B, between Hamline and Lexington avenues.
    • Line installation, material staging and restoration.
    • One-way westbound only traffic.

Local businesses and residences will remain accessible. Please follow posted detours. Schedules are subject to change.

We are coordinating our project construction with the following projects:


Friday, Sept. 2, 2022

In observance of Labor Day, crews will not work on Monday, Sept. 5, 2022.

During the coming week, crews will work in the following areas:

  • Hamline Avenue, between County Road C and Rose Place.
    • Line installation and material staging.
    • One-way, northbound only traffic.
    • Follow posted detours.
  • Southeast corner of Hamline Avenue and Rose Place.
    • Regulator station work.
    • No traffic impacts.
  • County Road B, between Hamline and Lexington avenues.
    • Line installation, material staging and restoration.
    • Testing activities.
    • One-way westbound only traffic.

Local businesses and residences will remain accessible. Please follow posted detours. Schedules are subject to change.

We are coordinating our project with the following projects and events:


Friday, Aug. 26, 2022

During the coming week, crews will work in the following areas:

  • County Road B, between Hamline and Lexington avenues.
    • Line installation, material staging and restoration.
    • Testing activities.
    • One-way westbound only traffic.
  • Southeast corner of Hamline Avenue and Rose Place.
    • Regulator station work.
    • No traffic impacts.

Local businesses and residences will remain accessible. Please follow posted detours. Schedules are subject to change.

We are coordinating our project with the following projects and events:


Friday, Aug. 19, 2022

During the coming week, crews will work in the following areas:

  • Hamline Avenue, between County Road C and County Road B2.
    • Line installation, material staging and restoration.
    • One-way northbound only traffic.
      • Will reopen to two-way traffic by the end of the day Wednesday, Aug. 24, 2022.
  • Intersection of Hamline Avenue and County Road B2.
    • Restoration activities.
    • Shifting lanes, two-way traffic allowed.
  • Hamline Avenue, between County Road B2 and County Road B.
    • Line installation, material staging and restoration.
    • One-way northbound only traffic.
      • Will reopen to two-way traffic by the end of the day Wednesday, Aug. 24, 2022.
  • County Road B, between Hamline and Lexington avenues.
    • Line installation, material staging and restoration.
    • One-way westbound only traffic.

Local businesses and residences will remain accessible. Please follow posted detours. Schedules are subject to change.

We are coordinating our project with the following projects and events:


Friday, Aug. 12, 2022

During the coming week, crews will work in the following areas:

  • Hamline Avenue, between County Road C and County Road B2.
    • Line installation, material staging and restoration.
    • One-way northbound only traffic.
  • Intersection of Hamline Avenue and County Road B2.
    • Restoration activities.
    • Shifting lanes, two-way traffic allowed.
  • Hamline Avenue, between County Road B2 and County Road B.
    • Line installation, material staging and restoration.
    • Natural gas testing activities.
    • Shifting lanes, two-way traffic allowed.
  • County Road B, between Hamline and Lexington avenues.
    • Line installation, material staging and restoration.
    • One-way westbound only traffic.

Local businesses and residences will remain accessible. Please follow posted detours. Schedules are subject to change.

We are coordinating our project with the following projects and events:


Friday, Aug. 5, 2022

During the coming week, crews will work in the following areas:

  • Hamline Avenue, between County Road C and County Road B2.
    • Line installation and material staging.
    • One-way northbound only traffic.
  • Hamline Avenue, between County Road B2 and County Road B.
    • Line installation, material staging and restoration.
    • Natural gas testing activities.
    • Shifting lanes, two-way traffic allowed.
  • County Road B, between Hamline and Lexington avenues.
    • Line installation, material staging and restoration.
    • One-way westbound only traffic.

Local businesses and residences will remain accessible. Please follow posted detours. Schedules are subject to change.

We are coordinating our project with the following projects and events:


Friday, July 29, 2022

During the coming week, crews will work in the following areas:

  • Hamline Avenue, between County Road C and County Road B2.
    • Line installation and material staging.
    • One-way northbound only traffic.
  • Hamline avenue, between County Road B2 and County Road B.
    • Line installation, material staging and restoration.
    • Natural gas testing activities.
    • Shifting lanes, two-way traffic allowed.
  • County Road B, between Hamline and Lexington avenues.
    • Line installation, material staging and restoration.
    • One-way westbound only traffic.

Local businesses and residences will remain accessible. Please follow posted detours. Schedules are subject to change.

We are coordinating our project with the following projects and events:


Friday, July 22, 2022

During the coming week, crews will work in the following areas:

  • Hamline Avenue, between County Road C and County Road B2.
    • Line installation and material staging.
    • One-way northbound only traffic.
    • Local businesses and residences will remain accessible.
    • Follow posted detours.
  • Hamline Avenue, between County Road B2 and County Road B.
    • Line installation, material staging and restoration.
    • Natural gas testing activities.
    • Shifting lanes, two-way traffic allowed.
    • Local businesses and residences will remain accessible.
    • Follow posted detours.
  • County Road B, between Hamline and Lexington avenues.
    • Line installation, material staging and restoration.
    • One-way westbound only traffic.
    • Local businesses and residences will remain accessible.
    • Follow posted detours.

Please note that construction schedules are subject to change.

We are coordinating our project construction with the following projects:


Friday, July 15, 2022

Crews have installed approximately 65% of this year’s natural gas main line. We will continue to share progress with your during construction.

During the coming week, crews will work in the following areas:

  • Hamline Avenue, between County Road C and County Road B2.
    • Line installation and material staging.
    • One-way northbound only traffic.
    • Local businesses and residences will remain accessible.
    • Follow posted detours.
  • Hamline Avenue, between County Road B2 and County Road B.
    • Line installation, material staging and restoration.
    • Shifting lanes, two-way traffic allowed.
    • Local businesses and residences will remain accessible.
    • Follow posted detours.
  • County Road B, between Hamline and Lexington avenues.
    • Line installation, material staging and restoration.
    • One-way westbound only traffic.
    • Local businesses and residences will remain accessible.
    • Follow posted detours.

Please note that construction schedules are subject to change.

We are coordinating our project construction with the following projects:


Friday, July 8, 2022

During the coming week, crews will work in the following areas:

  • Hamline Avenue, between County Road C and County Road B2.
    • Line installation and material staging.
    • One-way northbound only traffic.
    • Local businesses and residences will remain accessible.
    • Follow posted detours.
  • Intersection of Hamline Avenue and County Road B2.
    • Line installation.
    • Shifting lane closures.
    • Follow posted detours.
  • Hamline Avenue, between County Road B2 and County Road B.
    • Line installation, material staging and restoration.
    • Shifting lanes, two-way traffic allowed.
    • Local businesses and residences will remain accessible.
    • Follow posted detours.
  • County Road B, between Hamline and Lexington avenues.
    • Line installation, material staging and restoration.
    • One-way westbound only traffic.
    • Local businesses and residences will remain accessible.
    • Follow posted detours.

Please note that construction schedules are subject to change.

We are coordinating our project construction with the following projects:


Friday, July 1 , 2022

In observance of Independence Day, crews will not work on Monday, July 4, 2022.

During the coming week, crews will work in the following areas:

  • Hamline Avenue, between County Road C and County Road B2
    • Line installation and material staging.
    • One-way northbound only traffic.
    • Local businesses and residences will remain accessible.
    • Follow posted detours.
  • Intersection of Hamline Avenue and County Road B2.
    • Line installation.
    • Shifting lane closures.
    • Follow posted detours.
  • Hamline Avenue, between County Road B2 and County Road B.
    • Line installation, material staging and restoration.
    • One-way northbound only traffic.
    • Local businesses and residences will remain accessible.
    • Follow posted detours.
  • County Road B, between Hamline and Lexington avenues.
    • Line installation, material staging and restoration.
    • One-way westbound only traffic.
    • Local businesses and residences will remain accessible.
    • Follow posted detours.

Please note that construction schedules are subject to change.

We are coordinating our project construction with the following projects and events:


Friday, June 24, 2022

In observance of Independence Day, crews will not work on Monday, July 4, 2022.

During the coming week, crews will work in the following areas:

  • Hamline Avenue, between County Road C and County Road B2
    • Line installation and material staging.
    • One-way northbound only traffic.
    • Local businesses and residences will remain accessible.
    • Follow posted detours.
  • Intersection of Hamline Avenue and County Road B2.
    • Line installation.
    • Shifting lane closures.
    • Follow posted detours.
  • Hamline Avenue, between County Road B2 and County Road B.
    • Line installation, material staging and restoration.
    • One-way northbound only traffic.
    • Local businesses and residences will remain accessible.
    • Follow posted detours.
  • County Road B, between Hamline and Lexington avenues.
    • Line installation, material staging and restoration.
    • One-way westbound only traffic.
    • Local businesses and residences will remain accessible.
    • Follow posted detours.

Please note that construction schedules are subject to change.

We are coordinating our project construction with the following projects and events:


Friday, June 17, 2022

Crews have installed approximately 30 percent of this year natural gas main line. We will continue to share progress with you during construction.

During the coming week, crews will work in the following areas:

  • Hamline Avenue, between Brooks Avenue/Willow Circle and County Road B2
    • Line installation and material staging.
    • One-way northbound only traffic.
    • Local businesses and residences will remain accessible.
    • Follow posted detours.
  • Intersection of Hamline Avenue and County Road B2.
    • Line installation.
    • Shifting lane closures.
    • Follow posted detours.
  • Hamline Avenue, between County Road B2 and County Road B.
    • Line installation, material staging and restoration.
    • One-way northbound only traffic.
    • Local businesses and residences will remain accessible.
    • Follow posted detours.
    • Sidewalk and crosswalk closures.
      • Utilize designated crosswalks.
      • Do not enter construction areas.
      • Follow posted detours and direction from construction crews.
  • County Road B, between Hamline and Lexington avenues.
    • Line installation, material staging and restoration.
    • One-way westbound only traffic.
    • Local businesses and residences will remain accessible.
    • Follow posted detours.

Please note that construction schedules are subject to change.

We are coordinating our project construction with the following projects and events:


Friday, June 3, 2022

During the coming week, crews will work in the following areas:

  • Hamline Avenue, between County Road B2 and County Road B.
    • Line installation and material staging.
    • One-way northbound only traffic.
    • Local businesses and residences will remain accessible.
    • Follow posted detours.
    • Sidewalk and crosswalk closures.
      • Utilize designated crosswalks.
      • Do not enter construction areas.
      • Follow posted detours and direction from construction crews.
  • Intersection of County Road B and Hamline Avenue.
    • Line installation and material staging.
    • Shifting lanes and lane closures.
    • Local businesses and residences will remain accessible.
    • Follow posted detours.
  • County Road B, between Hamline and Lexington avenues.
    • Line installation, material staging and restoration.
    • City of Roseville’s County Road B Watermain Improvements Project.
    • One-way westbound only traffic.
    • Local businesses and residences will remain accessible.
    • Follow posted detours.

Please note that construction schedules are subject to change.

We are coordinating with the City of Roseville’s County Road B Watermain Improvements Project taking place on County Road B, between Lexington Avenue and Dellwood Street. This project is concluding in the coming weeks.

We are also coordinating with Ramsey County’s County Road B2 & Lexington Avenue Intersection Reconstruction Project. This project will start the week of June 13, 2022, and work will occur for 2 weeks.


Friday, May 27, 2022

In observance of the Memorial Day holiday, crews will not work on Monday, May 30, 2022.

During the coming week, crews will work in the following areas:

  • Hamline Avenue, between County Road B2 and Commerce Street.
    • Line installation and material staging.
    • Shifting lanes, two-way traffic allowed.
    • Local businesses and residences will remain accessible.
  • Hamline Avenue, between Commerce Street and County Road B.
    • Line installation and material staging.
    • One-way southbound only traffic.
    • Local businesses and residences will remain accessible.
    • Follow posted detours.
  • Intersection of County Road B and Hamline Avenue.
    • Line installation and material staging.
    • Shifting lanes and lane closures.
    • Local businesses and residences will remain accessible.
    • Follow posted detours.
  • County Road B, between Hamline and Lexington avenues.

Please note that construction schedules are subject to change.

We are also coordinating with the City of Roseville’s County Road B Watermain Improvements Project taking place on County Road B, between Lexington Avenue and Dellwood Street.


Friday, May 20, 2022

In observance of the Memorial Day holiday, crews will not work on Monday, May 30, 2022.

During the coming week, crews will work in the following areas:

  • Hamline Avenue, between County Road C and Rose Place.
    • Shifting lanes, two-way traffic allowed.
    • Local businesses and residences will remain accessible.
  • Hamline Avenue, between County Road B2 and Commerce Street.
    • Line installation and material staging.
    • Shifting lanes, two-way traffic allowed.
    • Local businesses and residences will remain accessible.
  • Hamline Avenue, between Commerce Street and County Road B.
    • Line installation and material staging.
    • One-way southbound only traffic.
    • Local businesses and residences will remain accessible.
    • Follow posted detours.
  • County Road B, between Hamline and Lexington avenues.

Please note that construction schedules are subject to change.

We are also coordinating with the City of Roseville’s County Road B Watermain Improvements Project taking place on County Road B, between Lexington Avenue and Dellwood Street.


Friday, May 13, 2022

During the coming week, crews will work in the following areas:

  • Hamline Avenue, between County Road C and Rose Place.
    • Shifting lanes, two-way traffic allowed.
    • Local businesses and residences will remain accessible.
  • Hamline Avenue, between County Road B2 and Commerce Street.
    • Line installation and material staging.
    • Shifting lanes, two-way traffic allowed.
    • Local businesses and residences will remain accessible.
  • Hamline Avenue, between Commerce Street and County Road B.
    • Line installation and material staging.
    • One-way southbound only traffic.
    • Local businesses and residences will remain accessible.
    • Follow posted detours.
  • County Road B, between Hamline and Lexington avenues.

Please note that construction schedules are subject to change.

We are also coordinating with the City of Roseville’s County Road B Watermain Improvements Project taking place on County Road B, between Lexington Avenue and Dellwood Street.


Friday, May 6, 2022

During the coming week, crews will work in the following areas:

  • Hamline Avenue, between County Road C and Rose Place.
    • Shifting lanes, two-way traffic allowed.
    • Local businesses and residences will remain accessible.
  • Hamline Avenue, between County Road B2 and Commerce Street.
    • Line installation and material staging.
    • Shifting lanes, two-way traffic allowed.
    • Local businesses and residences will remain accessible.
  • Hamline Avenue, between Commerce Street and County Road B.
    • Line installation and material staging.
    • One-way southbound only traffic.
    • Local businesses and residences will remain accessible.
    • Follow posted detours.
  • County Road B, between Hamline and Lexington avenues.

Please note that construction schedules are subject to change.

We are also coordinating with the City of Roseville’s County Road B Watermain Improvements Project taking place on County Road B, between Lexington Avenue and Dellwood Street.


Friday, April 29, 2022

During the coming week, crews will work in the following areas:

  • Hamline Avenue, between County Road B2 and Commerce Street.
    • Line installation and material staging.
    • Shifting lanes, two-way traffic allowed.
  • Hamline Avenue, between Commerce Street and County Road B.
    • Line installation and material staging.
    • One-way southbound only traffic.
    • Follow posted detours.

Please note that construction schedules are subject to change.

We are also coordinating with the City of Roseville’s County Road B Watermain Improvements Project taking place on County Road B, between Lexington Avenue and Dellwood Street.


Friday, April 22, 2022

During the coming week, crews will work in the following areas:

  • Hamline Avenue, between County Road B2 and Commerce Street.
    • Line installation and material staging.
    • Shifting lanes, two-way traffic allowed.
  • Hamline Avenue, between Commerce Street and County Road B.
    • Line installation and material staging.
    • One-way southbound only traffic.
    • Follow posted detours.
  • Temporary Materials Storage Area.
    • 1742 Commerce Street.
    • Material deliveries and material staging.

Please note that construction schedules are subject to change.

We are also coordinating with the City of Roseville’s County Road B Watermain Improvements Project taking place on County Road B, between Lexington Avenue and Dellwood Street.


Friday, April 15, 2022

Major construction activities for 2022 begin the week of April 18, 2022.

During the coming week, construction will occur in the following areas.

  • Hamline Avenue, between County Road B2 and Commerce Street.
    • Line installation and material staging.
    • Shifting lanes, two-way traffic allowed.
  • Hamline Avenue, between Commerce Street and Sandhurst Drive.
    • Line installation and material staging.
    • One-way southbound only traffic.
    • Follow posted detours.

Please note that construction schedules are subject to change.

We are also coordinating with the City of Roseville’s County Road B Watermain Improvements Project taking place on County Road B, between Lexington Avenue and Dellwood Street.


Friday, March 11, 2022

Thank you to everyone who attended our virtual open house!

We want to thank everyone who attended the Northeast Metro virtual open house this past Wednesday evening to learn more about the project.

If you were unable to attend the virtual open house, you can view the presentation and a recording of the meeting on our website. If you have additional questions about the project, do not hesitate to contact us.

This year’s construction activities will start in April 2022 and will take place on County Road B, between Lexington and Hamline avenues, and on Hamline Avenue, between County Road B and County Road C. As we approach the start of construction, we will provide additional updates.

Please note that construction schedules are subject to change.


Friday, Feb. 25, 2022

You’re invited to our virtual open house to learn more about project construction in 2022.

  • Date: Wednesday, March 9, 2022
  • Time: 6 p.m. – 7 p.m.
  • Join online: Click Here
  • Dial-in number: 855-962-1519

Can’t make it? We’ll post the virtual open house presentation and recording following the live event.

Click here to learn more about the virtual open house.

We are currently planning and permitting 2022 construction which will start in April and be constructed on County Road B, between Lexington and Hamline avenues, and on Hamline Avenue, between County Road B and County Road C.

We will keep you informed prior to the start of construction.


Friday, Oct. 22, 2021

We have completed this year’s natural gas construction. It was our pleasure to work in your neighborhood, and we thank you for your patience and cooperation.

Minor restoration activities will continue through this month. Construction will resume in spring 2022 on County Road B, between Lexington and Hamline avenues, and on Hamline Avenue, between County Road B and County Road C.

We will keep you informed prior to the start of next year’s construction.


Friday, Oct. 15, 2021

We’ve completed line installation for 2021. We’ll restore work areas through October.

During the coming week, we will work in the following areas:

  • County Road B, between Rice Street and Lexington Avenue.
    • Minor restoration in remaining areas.
  • County Road B, between Lexington and Hamline avenues.
    • Marking of utility lines and utility survey holes.
    • Short-term, shifting lane closures.
  • Hamline Avenue, between County Road B and County Road C.
    • Marking of utility lines and utility survey holes.
    • Short-term, shifting lane closures.

Schedules are subject to change.


Friday, Oct. 8, 2021

We’ve completed line installation for 2021. We will restore work areas through October.

During the coming week, we will work in the following areas:

  • County Road B, between Rice Street and Lexington Avenue.
    • Minor restoration in remaining areas.
  • County Road B, between Lexington and Hamline avenues.
    • Marking of utility lines and utility survey holes.
    • Short-term, shifting lane closures.
  • Hamline Avenue, between County Road B and County Road C.
    • Marking of utility lines and utility survey holes.
    • Short-term, shifting lane closures.

Schedules are subject to change.


Friday, Oct. 1, 2021

We’ve successfully completed line installation for 2021 and the line is serving our community. We will restore work areas through October.

During the coming week, we will work in the following areas:

  • County Road B, between Rice Street and Lexington Avenue.
    • Minor restoration in remaining areas.
  • County Road B, between Lexington Avenue and Lexington Park.
    • Restoration.
    • Left-turn lane on County Road B at Lexington Avenue heading toward MN 36 closed on Oct. 4, 2021, and Oct. 5, 2021.
    • Two-way traffic on County Road B.
    • Follow posted detours.
  • County Road B, between Parkview Center School and Dale Street.
    • Installation and restoration.
    • Lane shift.
    • Two-way traffic on County Road B.
  • County Road B, between Lexington and Hamline avenues.
    • Marking of utility lines and utility survey holes.
    • Short-term, shifting lane closures.
  • Hamline Avenue, between County Road B and County Road C.
    • Marking of utility lines and utility survey holes.
    • Short-term, shifting lane closures.

Schedules are subject to change.


Friday, Sept. 24, 2021

We’ve successfully completed installation for this year, with the new gas line returning to service this week. County Road B has been reopened to two-way traffic between Rice Street and Lexington Avenue. We will restore work areas through October.

During the coming week, we will work in the following areas:

  • County Road B, between Rice Street and Lexington Avenue.
    • Restoration.
    • Shoulder closure.
  • County Road B, between Lexington and Hamline avenues.
    • Marking of utility lines and utility survey holes.
    • Short-term, shifting lane closures.
  • Hamline Avenue, between County Road B and County Road C.
    • Marking of utility lines and utility survey holes.
    • Short-term, shifting lane closures.

Schedules are subject to change.


Friday, Sept. 17, 2021

Natural gas line installation is complete for this year, and County Road B has been reopened between Albemarle Court and Lexington Avenue. We will perform line testing procedures and restoration through October.

During the coming week, construction will occur in the following areas:

  • County Road B, between Rice Street and Albemarle Court.
    • Testing activities.
    • One-way traffic on County Road B, from Rice Street to Albemarle Court.
    • Temporary sidewalk in place.
  • County Road B, between Victoria Street and Lexington Avenue.
    • Restoration.
  • County Road B, between Lexington Avenue and Lexington Park parking lot.
    • Testing activities.
    • Shifting lanes.
    • Crosswalk closure.
  • County Road B, between Lexington and Hamline avenues.
    • Marking of utility lines and utility survey holes.
    • Short-term, shifting lane closures.
  • Hamline Avenue, between County Road B and County Road C.
    • Marking of utility lines and utility survey holes.
    • Short-term, shifting lane closures.

Construction schedules are subject to change.


Friday, Sept. 10, 2021

During the coming week, construction will occur in the following areas:

  • County Road B, between Rice Street and Albemarle Court.
    • Testing activities.
    • One-way traffic on County Road B, from Rice Street to Albemarle Court.
    • Temporary sidewalk in place.
  • County Road B, between Cohansey Boulevard and Dale Street.
    • Restoration.
  • County Road B, between Dale and Victoria streets.
    • Restoration.
    • Follow posted detours.
    • Short-term driveway closures.
  • Intersection of County Road B and Victoria Street.
    • Restoration.
    • Victoria Street closed to through traffic.
  • County Road B, between Victoria Street and Lexington Avenue.
    • Line installation.
    • One-way traffic on County Road B, from Victoria Street to Lexington Avenue.
    • Follow posted detours.
    • Short-term driveway closures.
  • County Road B, between Lexington Avenue and Lexington Park parking lot.
    • Testing activities.
    • Shifting lanes.
    • Crosswalk closure.

Construction schedules are subject to change.


Friday, Sept. 3, 2021

In observance of Labor Day, crews will not work Sunday, Sept. 5, 2021, and Monday, Sept. 6, 2021. Construction will resume on Tuesday, Sept. 7, 2021.

During the coming week, construction will occur in the following areas:

  • County Road B, between Rice Street and Albemarle Court.
    • Testing activities.
    • One-way traffic on County Road B from Rice Street toward Albemarle Court.
    • Temporary sidewalk in place.
  • County Road B, between Cohansey Boulevard and Dale Street.
    • Restoration activities.
    • Crews will return later this year for permanent restoration.
  • County Road B, between Dale and Victoria streets.
    • Restoration activities.
    • Follow posted detours.
    • Short-term driveway closures.
  • Intersection of County Road B and Victoria Street.
    • Restoration activities.
    • Victoria Street closed to through traffic starting Tuesday, Sept. 7, 2021.
  • County Road B, between Victoria Street and Lexington Avenue.
    • Line installation.
    • One-way traffic on County Road B from Victoria Street toward Lexington Avenue.
    • Follow posted detours.
    • Short-term driveway closures.
  • County Road B, between Lexington Avenue and Lexington Park parking lot.
    • Testing activities.
    • Shifting lanes.
    • Crosswalk closure.

Construction schedules are subject to change.


Friday, Aug. 27, 2021

Crews have installed more than 80 percent of this year’s natural gas line. We plan to complete line installation and begin testing activities in September 2021. We will continue to share progress with you during construction.

During the coming week, construction will occur in the following areas:

  • County Road B, between Rice and Dale streets.
    • Restoration activities.
    • Crews will return later this year for permanent restoration.
  • County Road B, between Dale and Victoria streets.
    • Line installation and restoration.
    • One-way traffic on County Road B from Dale Street toward Vicotria Street.
    • Follow posted detours.
    • Short-term driveway closures.
  • County Road B, between Victoria Street and Lexington Avenue.
    • Line installation.
    • One-way traffic on County Road B from Victoria Street toward Lexington Avenue.
    • Follow posted detours.
    • Short-term driveway closures.

Construction schedules are subject to change.


Friday, Aug. 20, 2021

During the week of Aug. 23, 2021, crews will work in the following areas:

  • County Road B, between Rice and Dale streets. Crews are conducting restoration activities. Crews will return later this year for permanent restoration.
  • County Road B, between Dale and Victoria streets. One-way traffic is in place on County Road B with traffic open from Dale Street toward Victoria Street. Through traffic should follow posted detours. Short-term closures of driveways will occur.
  • Intersection of County Road B and Victoria Street. Victoria Street is closed to through traffic. Please follow posted detours, and sites will remain accessible.
  • County Road B, between Victoria Street and Lexington Avenue. One-way traffic is in place on County Road B with traffic open from Victoria Street toward Lexington Avenue. Through traffic should follow posted detours. Short-term driveway closures will occur.

Please note that construction schedules are subject to change.


Friday, Aug. 13, 2021

During the week of Aug. 16, 2021, crews will work in the following areas:

  • County Road B, between Rice and Dale streets. Crews are conducting minor restoration activities. Crews will return later this year for permanent restoration.
  • County Road B, between Dale and Victoria streets. One-way traffic is in place on County Road B with traffic open from Dale Street toward Victoria Street. Through traffic should follow posted detours. Short-term closures of driveways will occur.
  • Intersection of County Road B and Victoria Street. Victoria Street is closed to through traffic. Through traffic should follow posted detours. Sites will remain accessible.
  • County Road B, between Victoria Street and Lexington Avenue. One-way traffic is in place on County Road B with traffic open from Victoria Street toward Lexington Avenue. Through traffic should follow posted detours. Short-term closures of driveways will occur.

Please note that construction schedules are subject to change.

The City of Roseville County Road B Utility Project is underway at the intersections of County Road B and Cohansey Street and of County Road B and Dale Street. Road closures and detours will occur. Click here to view a flyer provided by the City to learn more about the construction details. For additional information, visit the City’s website.


Friday, Aug. 6, 2021

During the week of Aug. 9, 2021, crews will work in the following areas:

  • County Road B, between Rice and Dale streets. Crews are conducting minor restoration activities. Crews will return later this year to complete permanent restoration.
  • County Road B, between Dale and Victoria streets. One-way traffic is in place on County Road B with traffic open from Dale Street toward Victoria Street. Work will start at Dale Street and head toward Victoria Street. Through traffic should follow posted detours. Short-term closures of driveways will occur.
  • Intersection of County Road B and Victoria Street. Starting as early as next week, Victoria Street will be closed to through traffic. Through traffic should follow posted detours. Sites will remain accessible.
  • County Road B, between Victoria Street and Lexington Avenue. Starting as early as next week, one-way traffic will be implemented on County Road B with traffic open from Victoria Street toward Lexington Avenue. Through traffic should follow posted detours. Short-term closures of driveways will occur.

Please note that construction schedules are subject to change.

The City of Roseville has started their County Road B Utility Project at the intersections of County Road B and Cohansey Street and of County Road B and Dale Street. Road closures and detours will occur. Click here to view a flyer provided by the City to learn more about the construction details. For additional information, visit the City’s website.


Friday, July 30, 2021

Crews have installed more than 50 percent of this year’s natural gas line. We will continue to share progress with you during the project.

During the week of Aug. 2, 2021, crews will work in the following areas:

  • County Road B, between Rice and Dale streets. Natural gas line installation has been completed in this area and crews are conduction minor restoration activities on County Road B. Crews will return later this summer to complete final restoration. County Road B, between Rice Street and Bossard Drive, will reopen to two-way traffic next week.
    • Starting as early as Aug. 2, 2021, the City of Roseville will begin their County Road B Utility Project at the intersections of County Road B and Cohansey Street and of County Road B and Dale Street. Road closures and detours will occur. Click here to view a flyer provided by the City to learn more about the construction details. For additional information, visit the City’s website.
  • County Road B, between Dale and Victoria streets. One-way traffic is in place on County Road B with traffic open from Dale Street toward Victoria Street. Work will start at Dale Street and head toward Victoria Street. Through traffic should follow posted detours. Short-term closures of driveways will occur.

Please note that construction schedules are subject to change.


Friday, July 23, 2021

During the week of July 26, 2021, crews will work in the following areas:

  • County Road B, between Rice and Dale streets. One-way traffic is in place on County Road B with traffic open from Rice Street toward Dale Street. Through traffic should follow posted detours. A temporary sidewalk is in place along County Road B. Short-term closures of driveways will occur.
    • We anticipate reopening County Road B, between Rice Street and Bossar Drive, to two-way traffic next week. Through traffic should follow posted detours.
    • Starting as early as Aug. 2, 2021, the City of Roseville will begin the County Road B Utility Project at the intersections of County Road B and Cohansey Street and of County Road B and Dale Street. Road closures and detours will occur. Click here to view a flyer provided by the City to learn more about the construction details. For additional information, visit the City’s website.
  • County Road B, between Dale and Victoria streets. One-way traffic is in place on County Road B with traffic open from Dale Street toward Victoria Street. Work will start at Dale Street and head toward Victoria Street. Through traffic should follow posted detours. Short-term closures of driveways will occur.

Please note that construction schedules are subject to change.


Friday, July 16, 2021

During the week of July 19, 2021, crews will work in the following areas:

County Road B, between Rice and Dale streets. One-way traffic is in place on County Road B with traffic open from Rice Street toward Dale Street. Through traffic should follow posted detours. A temporary sidewalk is in place along County Road B. Short-term closures of driveways will occur.

County Road B, between Dale and Victoria streets. One-way traffic will be in place on County Road B with traffic open from Dale Street toward Victoria Street. Work will start at Dale Street and head toward Victoria Street. Through traffic should follow posted detours. Short-term closures of driveways will occur.

Please note that construction schedules are subject to change.

The City of Roseville’s County Road B Utility Improvements Project will take place this summer on County Road B, between Dale and Cohansey streets. Our team is coordinating with the City for construction activities. Visit the City’s website to learn more.


Friday, July 9, 2021

We continue to make progress for our 2021 natural gas line work, having installed more than 25 percent of line for the year. We are still on target to complete the work on County Road B between Rice Street and Lexington Avenue this fall. We will provide updates throughout the project.

During the week of July 12, 2021, crews will work in the following areas:

County Road B, between Rice and Dale streets. One-way traffic is in place on County Road B with traffic open from Rice Street toward Dale Street. Through traffic should follow posted detours. A temporary sidewalk is in place along County Road B. Short-term closures of driveways will occur.

County Road B, between Dale and Victoria streets. Work will start at Dale Street and head toward Victoria Street. Shifting lanes will occur on County Road B. Through traffic should follow posted detours. Short-term closures of driveways will occur.

Please note that construction schedules are subject to change.

The City of Roseville’s County Road B Utility Improvements Project will take place this summer on County Road B, between Dale and Cohansey streets. Our team is coordinating with the City for construction activities. Visit the City’s website to learn more.


Friday, July 2, 2021

In observance of Independence Day, crews will not work Sunday, July 4, 2021, and Monday, July 5, 2021. Construction activities will resume on Tuesday, July 6, 2021.

During the week of July 6, 2021, crews will work in the following areas:

County Road B, between Rice and Dale streets. One-way traffic restrictions are in place on County Road B with traffic open from Rice Street heading toward Dale Street. Through traffic should follow posted detours. A temporary sidewalk is in place along County Road B. Short-term closures of driveways will occur.

County Road B, between Dale and Victoria streets. Work will start at Dale Street and head toward Victoria Street. One-way traffic will occur on County Road B from Dale Street toward Victoria Street. Through traffic should follow posted detours. Short-term closures of driveways will occur.

Please note that construction schedules are subject to change.

The City of Roseville’s County Road B Utility Improvements Project will take place this summer on County Road B, between Dale and Cohansey streets. Our team is coordinating with the City for construction activities. Visit the City’s website to learn more.


Friday, June 25, 2021

Construction activities have been completed at County Road B and Lexington Avenue, and the roads have been reopened for traffic. We thank you for your patience as we worked in this area.

During the week of June 28, 2021, crews will work in the following area:

County Road B, between Rice and Dale streets. Work started at Rice Street and will head toward Dale Street. One-way traffic will occur on County Road B from Rice Street toward Dale Street. Through traffic should follow posted detours. A temporary sidewalk is in place along County Road B. Short-term closures of driveways will occur.

Starting in early July 2021, crews will work in the following area:

County Road B, between Dale and Victoria streets. Work will start at Dale Street and head toward Victoria Street. One-way traffic will occur on County Road B from Dale Street toward Victoria Street. Through traffic should follow posted detours. Short-term closures of driveways will occur.

Please note that construction schedules are subject to change.

The City of Roseville’s County Road B Utility Improvements Project will take place this summer on County Road B, between Dale and Cohansey streets. Our team is coordinating with the City for construction activities. Visit the City’s website to learn more.


Friday, June 18, 2021

We plan to open County Road B and Lexington Avenue to traffic this weekend. We thank the public for their patience as we have worked in this area.

During the week of June 21, 2021, crews will work in the following area:

County Road B, between Rice and Dale streets. Work started at Rice Street and will head toward Dale Street. One-way traffic will occur on County Road B from Rice Street toward Dale Street. Through traffic should follow posted detours. A temporary sidewalk will be in place along County Road B. Short-terms closures of driveways will occur.

Please note that construction schedules are subject to change.

The City of Roseville’s County Road B Utility Improvements Project will take place this summer on County Road B, between Dale and Cohansey streets. Our team is coordinating with the City for construction activities. Visit the City’s website to learn more.


Friday, June 11, 2021

During the week of June 14, 2021, crews will work in the following areas:

County Road B and Lexington Avenue. Natural gas line installation is ongoing. Following installation, crews will conduct paving and restoration activities. Two-way traffic will be maintained on Lexington Avenue, and lanes will be shifted. One-way only traffic on County Road B may occur and through traffic should follow posted detours. Sidewalk closures will occur, and sites will remain accessible.

County Road B, between Rice and Dale streets. Work will start at Rice Street and head toward Dale Street. One-way traffic will occur on County Road B, traveling from Rice Street toward Dale Street. Through traffic should follow posted detours. A temporary sidewalk will be in place along County Road B. Short-terms closures of driveways will occur.

Please note that construction schedules are subject to change.

The City of Roseville’s County Road B Utility Improvements Project will take place this summer on County Road B, between Dale and Cohansey streets. Our team is coordinating with the City for construction activities. Visit the City’s website to learn more.


Friday, June 4, 2021

During the week of June 7, 2021, crews will work in the following areas:

County Road B and Lexington Avenue. Natural gas line installation is ongoing. Following installation, crews will conduct paving and restoration activities. Two-way traffic will be maintained on Lexington Avenue, and lanes will be shifted. One-way only traffic on County Road B may occur and through traffic should follow posted detours. Sidewalk closures will occur, and sites will remain accessible.

County Road B, between Rice and Dale streets. Work will start at Rice Street and head toward Dale Street. One-way traffic will occur on County Road B, traveling from Rice Street toward Dale Street. Through traffic should follow posted detours. A temporary sidewalk will be in place along County Road B. Short-terms closures of driveways will occur.

Please note that construction schedules are subject to change.

The City of Roseville’s County Road B Utility Improvements Project will take place this summer on County Road B, between Dale and Cohansey streets. Our team is coordinating with the City for construction activities. Visit the City’s website to learn more.


Thursday, May 27, 2021

In observance of Memorial Day, crews will not work Sunday, May 30, 2021, and Monday, May 31, 2021. Construction activities will resume on Tuesday, June 1, 2021.

During the week of June 1, 2021, crews will work in the following areas:

County Road B and Lexington Avenue. Natural gas line installation has been completed, crews will complete paving and restoration activities. Two-way traffic will be maintained on Lexington Avenue, and lanes will be shifted. One-way only traffic on County Road B may occur and through traffic should follow posted detours. Sidewalk closures will occur, and sites will remain accessible.

County Road B, between Rice and Dale streets. Work will occur starting at Rice Street and head toward Dale Street. One-way traffic will occur on County Road B, traveling from Rice Street toward Dale Street. Through traffic should follow posted detours. A temporary sidewalk will be in place along County Road B and will be protected from traffic with barriers. Temporary driveway closures will occur.

Please note that construction schedules are subject to change.


Friday, May 21, 2021

During the week of May 24, 2021, crews will work in the following areas:

County Road B and Lexington Avenue. Work will occur in the southbound lane of Lexington Avenue in the intersection. Two-way traffic will be maintained on Lexington Avenue, and lanes will be shifted. One-way only traffic on County Road B may occur and through traffic should follow posted detours. Sidewalk closures will occur, and sites will remain accessible.

County Road B and Rice Street. You may see trucks and crews in the area preparing for construction in early June. Sites will remain accessible.

Starting in early June 2021, crews will work in the following area:

County Road B, between Rice and Dale streets. Work will occur starting at Rice Street and head toward Dale Street. One-way traffic will occur on County Road B, traveling from Rice Street toward Dale Street. Through traffic should follow posted detours. A temporary sidewalk will be in place along County Road B and will be protected from traffic with barriers. Temporary driveway closures will occur.

Please note that construction schedules are subject to change.


Friday, May 14, 2021

During the week of May 17, 2021, crews will work in the following area:

County Road B and Lexington Avenue. Lane closures, shifting lanes and sidewalk closures will occur. Two-way traffic on Lexington Avenue will be maintained. One-way only traffic on County Road B may occur and through traffic should follow posted detours. Sites will remain accessible.

During the week of May 24, 2021, crews will work in the following area:

County Road B and Lexington Avenue. Work will occur in the southbound lane of Lexington Avenue; two-way traffic will be maintained, and lanes will be shifted. One-way only traffic on County Road B may occur and through traffic should follow posted detours. Sidewalk closures will occur. Sites will remain accessible.

Please note that construction schedules are subject to change.


May 7, 2021

Construction is expected to begin the week of May 17, 2021 in the following area:

County Road B and Lexington Avenue. Lane closures, shifting lanes and sidewalk closures will occur for natural gas installation activities. Two-way traffic on Lexington Avenue will be maintained. One-way only traffic on County Road B may occur and through traffic should follow posted detours. Sites will remain accessible.

Please note that construction schedules are subject to change.


April 30, 2021

In the coming weeks, crews will be in the following area:

County Road B and Lexington Avenue. Lane closures and shifting lanes will occur for natural gas installation activities. Through traffic on Lexington Avenue will be maintained. One-way westbound only traffic on County Road B may occur and through traffic should follow posted detours. Sites will remain accessible.

Please note that construction schedules are subject to change.


April 23, 2021

We expect major construction activities to start the week of May 10, 2021.

During the week of May 3, 2021, crews will be in the following areas:

County Road B and Lexington Avenue. Short-term shoulder closures and shifting lanes will occur for construction preparation activities. Through traffic will be allowed and sites will remain accessible.

County Road B, between Dale and Grotto streets. Short-term shoulder closures and shifting lanes will occur for minor construction activities. Through traffic will be allowed and sites will remain accessible.

Please note that construction schedules are subject to change.

For additional information, contact us.


April 2021

Construction activities for the Northeast Metro Natural Gas Project will begin in May 2021 near the intersection of Lexington Avenue and County Road B.

Construction activities for the Northeast Metro Natural Gas Project will begin in May 2021 near the intersection of Lexington Avenue and County Road B.

This year’s activities will occur on County Road B, between Rice Street and Lexington Avenue.

This website will be updated regularly during construction.

For additional information, contact us.


Friday, March 12, 2021

Over the coming weeks, we will conduct utility locate activities on Hamline Avenue, between County Road B and County Road B2. We will core sections of roadway to visually locate and record locations of utilities. While this work occurs, we will have temporary partial shifting lane closures in place.

We will continue to post updates here as we approach the start of construction.


Wednesday, Feb. 10, 2021

We want to thank everyone who attended our virtual open house to learn more about the project.

If you were unable to attend the virtual open house, you can view the presentation by clicking here.

If you have additional questions about the project, do not hesitate to contact us.

Construction in 2021 is expected to start this spring and will take place along County Road B, between Lexington Avenue and Rice Street. We will post regular resume updates as the project continues.

Construction in 2021 for Phase 3 will take place along County Road B, between Lexington Avenue and Rice Street. We anticipate starting construction in spring 2021. As we approach the start of construction in 2021, we will resume sending construction updates.


Friday, Oct. 30, 2020

The 2020 Northeast Metro Natural Gas Project construction activities have been successfully completed and the new natural gas lines installed for this project are safely serving our customers. Crews have completed installing the project’s natural gas lines, completed tie-ins to existing natural gas facilities and completed the majority of restoration of previous works areas. Minor restoration activities, including soft-surface restoration, will occur in spring 2021. These activities will occur along the Phase 2 project area weather permitting.

We thank the community for their patience during this vital natural gas project. The completion of this year’s portion of the project allows us to fulfill our commitment to system revitalization and allows us to continue to provide the safe, reliable natural gas service our current and future customers expect.

Construction in 2021 for Phase 3 will take place along County Road B, between Lexington Avenue and Rice Street. We anticipate starting construction in spring 2021. As we approach the start of construction in 2021, we will resume sending construction updates.

Please note that construction schedules are subject to change.

The City of Maplewood’s road project on County Road B, between Edgerton and Arcade streets, and on Arcade Street, between County Road B and Roselawn Avenue, is ongoing. To learn more about the City’s project, visit the City of Maplewood’s website.


Friday, Oct. 23, 2020

We are pleased to announce that previous work areas have reopened to through traffic. Crews will complete minor restoration activities in the coming weeks.

During the week of Oct. 26, 2020, crews will work at the following locations:

Intersection of County Road B and Edgerton Street. Shoulder closures will be in place for restoration activities. Local traffic to sites in this area will be allowed.

County Road B, between Highway 61 and Frontage Road. Short-term partial lane closures will occur for roadway restoration activities. Local traffic to sites in this area will be allowed.

County Road B, between Highway 61 and White Bear Avenue. Short-term partial lane closures will occur for roadway and soft surface restoration activities. Local traffic to sites in this area will be allowed.

Please note that construction schedules are subject to change.

The City of Maplewood’s road project on County Road B, between Edgerton and Arcade streets, and on Arcade Street, between County Road B and Roselawn Avenue, is ongoing. To learn more about the City’s project, visit the City of Maplewood’s website.


Friday, Oct. 16, 2020

During the week of Oct. 19, 2020, crews will work at the following locations:

Intersection of County Road B and Edgerton Street. Shoulder closures will be in place for restoration activities. Local traffic to sites in this area will be allowed. Additional activities unrelated to our project may cause closures of this intersection in the future.

County Road B, between Highway 61 and Frontage Road. Short-term partial lane closures will occur for roadway restoration activities. Local traffic to sites in this area will be allowed.

County Road B, between Highway 61 and White Bear Avenue. Short-term partial lane closures will occur for roadway and soft surface restoration activities. Local traffic to sites in this area will be allowed.

Please note that construction schedules are subject to change.

The City of Maplewood’s road project on County Road B, between Edgerton and Arcade streets, and on Arcade Street, between County Road B and Roselawn Avenue, is ongoing. To learn more about the City’s project, visit the City of Maplewood’s website.


Friday, Oct. 9, 2020

Phase 2 (2020) construction between Prosperity Road and Rice Street is substantially completed. Crews will continue work at natural gas regulator stations, conduct natural gas line testing procedures and restore previous work areas through fall 2020.

During the week of Oct. 12, 2020, construction will take place in the following areas:

County Road B, between McMenemy and Edgerton streets. Short-term partial lane closures will occur for roadway restoration activities. Local traffic to sites in this area will be allowed.

Intersection of County Road B and Edgerton Street. Shoulder closures will be in place for testing and restoration activities. Local traffic to sites in this area will be allowed. Additional activities unrelated to our project may cause closures of this intersection in the future.

County Road B, between Highway 61 and Frontage Road. Short-term partial lane closures will occur for roadway restoration activities. Local traffic to sites in this area will be allowed.

County Road B, between English Street and Prosperity Road. Short-term partial lane closures will occur for roadway restoration activities. Local traffic to sites in this area will be allowed.

County Road B, between Prosperity Road and White Bear Avenue. No through traffic will be allowed. Local traffic to sites in this area will be allowed.

Please note that construction schedules are subject to change.

The City of Maplewood’s road project on County Road B, between Edgerton and Arcade streets, and on Arcade Street, between County Road B and Roselawn Avenue, is ongoing. To learn more about the City’s project, visit the City of Maplewood’s website.


Friday, Oct. 2, 2020

We have installed the natural gas main for Phase 2. Crews will complete remaining work at natural gas regulator stations, conduct natural gas line testing and complete restoration activities through fall 2020.

During the week of Oct. 5, 2020, construction will take place in the following areas:

County Road B, between McMenemy and Edgerton streets. Short-term partial lane closures will occur for roadway restoration activities. Local traffic to sites in this area will be allowed.

Intersection of County Road B and Edgerton Street. Shoulder closures will be in place for testing and restoration activities. Local traffic to sites in this area will be allowed. Additional activities unrelated to our project may cause closures of this intersection in the future.

County Road B, between Highway 61 and Frontage Road. Short-term partial lane closures will occur for roadway restoration activities. Local traffic to sites in this area will be allowed.

County Road B, between English Street and Prosperity Road. Short-term partial lane closures will occur for roadway restoration activities. Local traffic to sites in this area will be allowed.

County Road B, between Prosperity Road and White Bear Avenue. No through traffic will be allowed. Local traffic to sites in this area will be allowed.

Please note that construction schedules are subject to change.

The City of Maplewood’s road project on County Road B, between Edgerton and Arcade streets, and on Arcade Street, between County Road B and Roselawn Avenue, is ongoing. To learn more about the City’s project, visit the City of Maplewood’s website.


Friday, Sept. 25, 2020

We have installed the natural gas main for Phase 2. Crews will complete remaining work at natural gas regulator stations, conduct natural gas line testing and complete restoration activities through fall 2020.

During the week of Sept. 28, 2020, construction will take place in the following areas:

County Road B, between McMenemy and Edgerton streets. Short-term partial lane closures will occur for roadway restoration activities. Local traffic to sites in this area will be allowed.

Intersection of County Road B and Edgerton Street. Shoulder closures will be in place for testing and restoration activities. Local traffic to sites in this area will be allowed. As weather allows, we will complete restoring this intersection to reopen it. Additional activities unrelated to our project may cause closures of this intersection in the future.

County Road B, between Prosperity Road and White Bear Avenue. No through traffic will be allowed. Local traffic to sites in this area will be allowed.

Please note that construction schedules are subject to change.

The City of Maplewood’s road project on County Road B, between Edgerton and Arcade streets, and on Arcade Street, between County Road B and Roselawn Avenue, is ongoing. To learn more about the City’s project, visit the City of Maplewood’s website.